Martin Trigaux 7df0c4b4a1 [REV] manufacturing: restore subcontracting page
This reverts commit 18e9a66f18.
It was removed in 12.0 but must be kept in 13.0
2019-06-17 13:25:50 +02:00
Martin Trigaux 74d97adb50 [REV] management: keep reference to subcontracting
As the page must be kept in 13.0

This reverts commit 6319743253.
remove reference to removed page
2019-06-17 13:24:40 +02:00
Martin Trigaux 6319743253 [FIX] management: remove reference to removed page
Was removed at 18e9a66f18
2019-06-17 13:21:23 +02:00
Julien B 18e9a66f18 [DEL]MRP:Subcontracting
Should have only been added to 13.0 and not 12.0
2019-04-26 15:04:45 +02:00
Julien B 5e608d18a9 [FIX]Manufacturing:Subcontracting
A small typo that led to an issue
2019-04-23 10:48:57 +02:00
Julien Bertrand bbc3b224e2 [ADD]Manufacturing:Subcontracting
Adding new page for subcontracting.
2019-04-15 11:25:06 +02:00
Yannick Tivisse c33ba77aad [MERGE] Forward port of 11.0 up to bcce8b4 2018-09-19 17:10:04 +02:00
Julien B d9d9496de8 [FIX] manufacturing : bill of material fix wrong direction
Some old sentence made it look like you could find an answer somewhere that is not available anymore.
2018-08-10 14:12:57 +02:00
Yannick Tivisse afe850df0d [ADD] manufacturing: Repair management
Origin document: https://docs.google.com/document/d/1W2luVE_tEKNKflbZTq2VEk4zRu1qUTXSRlV7xgE6lJ4/edit
2018-05-09 16:03:09 +02:00
Yannick Tivisse 9a36d2e405 [ADD] manufacturing: Unbuild a product
Original doc:https://docs.google.com/document/d/1mSDVpnEx82VvDDgxDrEsN032FFyVnCgSy41lqABkziw/edit
2018-04-05 16:23:29 +02:00
Yannick Tivisse 64ad5ff3d8 [IMP] manufacturing: Restructure pages 2017-12-21 16:31:29 +01:00
remz1337 8997488823 [FIX] manufacturing: Fix small typo in Setting up a basic BoM 2017-03-16 16:23:33 +01:00
Martin Trigaux bb5e0d41cc [FIX] mrp: do not manufactufe products 2016-12-21 10:14:45 +01:00
Yannick Tivisse 2b3e5997e8 [ADD] manufacturing: How to select the right replenishment strategy 2016-11-17 14:24:37 +01:00
Yannick Tivisse 67551b9798 [FIX] manufacturing: Correct page title 2016-11-17 14:02:24 +01:00
Yannick Tivisse fcb3dc4a1a [ADD] manufacturing: Setting up a BoM for a Product With Sub-Assemblies 2016-11-17 13:51:25 +01:00
Yannick Tivisse dd5bbf0766 [ADD] manufacturing: How to manage BoMs for product variants 2016-11-17 13:45:56 +01:00
Yannick Tivisse 43eda7d09c [FIX] manufacturing: fix image layout issue 2016-11-17 13:35:18 +01:00
Yannick Tivisse e6216685ae [ADD] manufacturing: How to Sell a Set of Products as a Kit 2016-11-17 13:28:27 +01:00
Yannick Tivisse 05391af089 [ADD] manufactuting: How to process a manufacturing order 2016-11-17 13:08:59 +01:00
Yannick Tivisse 3cc76159ae [ADD] manufacturing: How to Configure a Bill of Materials 2016-11-17 12:05:37 +01:00
Yannick Tivisse e404b6c58b [ADD] manufacturing: MRP Terminologies 2016-11-17 11:43:02 +01:00
Yannick Tivisse 259facecda [ADD] manufacturing: Introduction to Odoo Manufacturing 2016-11-17 11:09:03 +01:00