[I18N] Update translation terms from Transifex

This commit is contained in:
Odoo Translation Bot
2023-01-22 00:40:41 +01:00
parent 38c3897f85
commit d8140d6cba
38 changed files with 13285 additions and 2185 deletions
+86 -46
View File
@@ -16,7 +16,7 @@
# Patricia Gutiérrez Capetillo <pagc@odoo.com>, 2022
# AleEscandon <alejandra.escandon@jarsa.com.mx>, 2022
# Pablo Rojas <rojaspablo88@gmail.com>, 2022
# Josep Anton Belchi, 2022
# jabelchi, 2022
# Lucia Pacheco <lpo@odoo.com>, 2022
# Braulio D. López Vázquez <bdl@odoo.com>, 2022
# Lina Maria Avendaño Carvajal <lina8823@gmail.com>, 2022
@@ -28,7 +28,7 @@ msgid ""
msgstr ""
"Project-Id-Version: Odoo 16.0\n"
"Report-Msgid-Bugs-To: \n"
"POT-Creation-Date: 2022-12-23 09:13+0000\n"
"POT-Creation-Date: 2023-01-19 15:37+0000\n"
"PO-Revision-Date: 2022-10-04 12:53+0000\n"
"Last-Translator: Mariela Moreno <mam@odoo.com>, 2022\n"
"Language-Team: Spanish (https://www.transifex.com/odoo/teams/41243/es/)\n"
@@ -9110,83 +9110,123 @@ msgstr "Gestionar productos semielaborados"
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:5
msgid ""
"With Odoo MRP, you can use semi-finished products to simplify a complex "
"*Bill of Materials* or to represent your manufacturing flow more accurately."
" A *semi-finished product* is a manufactured product that is used as a "
"component in a Bill of Material."
"A *semi-finished product*, also known as a *subassembly*, is a manufactured "
"product that is used as a component in another product's bill of materials "
"(BoM). Semi-finished products are used to simplify complex :abbr:`BoMs "
"(Bills of Materials)` or to more accurately represent a manufacturing flow. "
"A :abbr:`BoM (Bill of Materials)` that contains semi-finished products is "
"referred to as a *multilevel BoM*, where the main *top-level product* and "
"its subassemblies are distinguished."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:10
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:12
msgid "Configure semi-finished products"
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:14
msgid ""
"A *BoM* that employs *semi-finished products* is referred to as a multi-"
"level BoM, where we distinguish between the *top level Product* and the "
"*sub-assemblies*."
"To set up a multilevel :abbr:`BoM (Bill of Materials)`, the top-level "
"product and semi-finished products must be configured. Therefore, the first "
"step is to create the semi-finished products and their :abbr:`BoMs (Bills of"
" Materials)`."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:15
msgid "Configure a Multi Level BoM"
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:19
msgid ":doc:`bill_configuration`"
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:17
msgid ""
"To configure a *multi-level BoM*, you will need the top-level product and "
"its sub-assemblies. Therefore, you must first create the sub-assembly "
"products and their respective Bill of Materials. Please refer to "
":doc:`bill_configuration` for more details on how to create a BOM."
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rstNone
msgid "A bill of materials for a semi-finished product."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:26
msgid "Configure the Main BoM"
msgstr "Configurar la LdM principal"
msgid "Create the top-level bill of materials (BoM)"
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:28
msgid ""
"Then on the final product form, simply add your semi-finished products to "
"the Bill of Material."
"After the semi-finished products are fully configured, navigate to "
":menuselection:`Manufacturing --> Products --> Products`. Then, "
":guilabel:`Create` the top-level product. Configure the product's "
"specifications as desired, and be sure to :guilabel:`Save`."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:35
msgid "Manage your production planning"
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:37
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:32
msgid ""
"There are several methods to manage the triggering of the various "
"manufacturing orders."
"Once the top-level product is configured, click the :guilabel:`Bill of "
"Materials` smart button on the product form, then click :guilabel:`Create` "
"to make a :abbr:`BoM (Bill of Materials)` for the top-level product. Then, "
"simply add the semi-finished products to this :abbr:`BoM (Bill of "
"Materials)`, along with any other necessary components."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:39
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rstNone
msgid ""
"If every time a manufacturing order is confirmed for the main product, you'd"
" like one for the semi-finished products as well, you have two options:"
"A bill of materials for a top-level product, containing a subassembly "
"component."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:42
msgid "Manage production planning"
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:44
msgid ""
"Option 1 : Create re-ordering rules for the semi-finished products, with "
"both the minimum and maximum desired stock quantities at 0."
"There are several methods to manage manufacturing order automation for "
"products with multilevel :abbr:`BoMs (Bills of Materials)`."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:48
msgid ""
"Option 2 : Use the Replenish on Order (MTO) route on the semi-finished "
"product, as well as the manufacturing one."
"Semi-finished products are specifically used to manage manufacturable "
"products with multilevel BoMs. If a BoM is being created simply to organize "
"components or bundle sellable products, using :doc:`Kits <kit_shipping>` is "
"the more appropriate option."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:51
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:52
msgid ""
"Note that Option 1 is usually recommended over Option 2 as it is more "
"flexible. The MTO route creates a unique link between the semi-finished and "
"the top level product, whereas the re-ordering rule allows you to simply "
"unreserve that production from the top level product production and redirect"
" it to another, more pressing demand, for example."
"To automatically trigger manufacturing orders for semi-finished products "
"after confirming a manufacturing order for the main product, there are two "
"options:"
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:56
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:55
msgid ""
"In any case, as soon as the semi-finished product is produced, it will "
"become available in the manufacturing order of the final product, as shown "
"below."
"**Option 1 (recommended):** Create *Reordering Rules* for the semi-finished "
"products and set both the minimum and maximum desired stock quantities to "
"`0`."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:59
msgid ":doc:`../../purchase/products/reordering`"
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:61
msgid ""
"**Option 2:** Activate the :guilabel:`Replenish on Order (MTO)` and "
":guilabel:`Manufacture` routes under the :guilabel:`Inventory` tab of the "
"semi-finished product's product form."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:64
msgid ""
"Option 1 is more flexible than Option 2 and is therefore recommended. "
"Reordering rules do not directly link demand to replenishment, and therefore"
" allow stocks to be unreserved and redirected to other orders, if necessary."
" The Replenish on Order (MTO) route creates a unique link between the semi-"
"finished and top-level products, exclusively reserving quantities for the "
"confirmed top-level manufacturing order."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rst:70
msgid ""
"Regardless of the method chosen, semi-finished products must be fully "
"manufactured before manufacturing can begin on the top-level product."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/sub_assemblies.rstNone
msgid "A manufacturing order for a top-level product."
msgstr ""
#: ../../content/applications/inventory_and_mrp/manufacturing/management/subcontracting.rst:3