[IMP] *: harmonize formatting

- Removed the numbering from headings because it was either inconsistent, breaking the implicit hyperlink target or useless.
- Fixed incorrect heading formattings.
- Replaced hand-written flows by the :menuselection: directive
This commit is contained in:
Antoine Vandevenne (anv)
2020-01-08 11:05:57 +01:00
committed by Antoine Vandevenne (anv)
parent 73fff57983
commit 4bb2eeda11
78 changed files with 810 additions and 621 deletions
@@ -22,9 +22,8 @@ other words, you choose to realize your manufacturing process in one
step and do not track the steps the product goes through.
Before creating your *BoM*, you have to create the product using the
*BoM* and, at least, one of the components. Go to the *Master Data*
menu > *Products* and create both the finished product and the
component.
*BoM* and, at least, one of the components. Go to the :menuselection:`Master Data menu --> Products`
and create both the finished product and the component.
Once done, go to the *Bills of Materials* menu under *Master Data*.
Now, create it. Choose the product from the dropdown menu and add your
+5 -2
View File
@@ -8,13 +8,16 @@ through subcontractors. This can be easily managed through Odoo.
Configuration
=============
Go to the *Manufacturing app > Configuration > Settings* and tick the
Go to the :menuselection:`Manufacturing app --> Configuration --> Settings` and tick the
box *Subcontracting*.
.. image:: media/subcontract_01.png
:align: center
You can now define subcontracted *Bill of Materials*. Therefore, you need to go to *Manufacturing > Master Data > Bill of Materials* and hit *Create*. In this *BoM*, list the components which will be used by the subcontractor to manufacture the subcontracted finished product. Specify that the *BoM* type is *Subcontracting*.
You can now define subcontracted *Bill of Materials*. Therefore, you need to go to
:menuselection:`Manufacturing --> Master Data --> Bill of Materials` and hit *Create*. In this
*BoM*, list the components which will be used by the subcontractor to manufacture the subcontracted
finished product. Specify that the *BoM* type is *Subcontracting*.
.. image:: media/subcontract_03.png
:align: center
+3 -3
View File
@@ -8,8 +8,8 @@ production based on your demand forecast.
Configuration
=============
Go to the *Manufacturing app > Configuration > Settings* and activate
the Master Production Schedule feature before hitting save.
Go to the :menuselection:`Manufacturing app --> Configuration --> Settings` and activate the Master
Production Schedule feature before hitting save.
.. image:: media/use_mps_01.png
:align: center
@@ -17,7 +17,7 @@ the Master Production Schedule feature before hitting save.
.. tip::
In the manufacturing settings, you can define the time range of your MPS (month/week/day) and the number of periods you want to display.
Now, go in *Planning > Master Production Schedule* and click on add a
Now, go in :menuselection:`Planning --> Master Production Schedule` and click on add a
product. You can now define your safety stock target (= the stock you
want to have on hand at the end of the period) and the minimum and
maximum quantities to replenish.