[IMP] *: harmonize formatting
- Removed the numbering from headings because it was either inconsistent, breaking the implicit hyperlink target or useless. - Fixed incorrect heading formattings. - Replaced hand-written flows by the :menuselection: directive
This commit is contained in:
committed by
Antoine Vandevenne (anv)
parent
73fff57983
commit
4bb2eeda11
@@ -22,9 +22,8 @@ other words, you choose to realize your manufacturing process in one
|
||||
step and do not track the steps the product goes through.
|
||||
|
||||
Before creating your *BoM*, you have to create the product using the
|
||||
*BoM* and, at least, one of the components. Go to the *Master Data*
|
||||
menu > *Products* and create both the finished product and the
|
||||
component.
|
||||
*BoM* and, at least, one of the components. Go to the :menuselection:`Master Data menu --> Products`
|
||||
and create both the finished product and the component.
|
||||
|
||||
Once done, go to the *Bills of Materials* menu under *Master Data*.
|
||||
Now, create it. Choose the product from the dropdown menu and add your
|
||||
|
||||
@@ -8,13 +8,16 @@ through subcontractors. This can be easily managed through Odoo.
|
||||
Configuration
|
||||
=============
|
||||
|
||||
Go to the *Manufacturing app > Configuration > Settings* and tick the
|
||||
Go to the :menuselection:`Manufacturing app --> Configuration --> Settings` and tick the
|
||||
box *Subcontracting*.
|
||||
|
||||
.. image:: media/subcontract_01.png
|
||||
:align: center
|
||||
|
||||
You can now define subcontracted *Bill of Materials*. Therefore, you need to go to *Manufacturing > Master Data > Bill of Materials* and hit *Create*. In this *BoM*, list the components which will be used by the subcontractor to manufacture the subcontracted finished product. Specify that the *BoM* type is *Subcontracting*.
|
||||
You can now define subcontracted *Bill of Materials*. Therefore, you need to go to
|
||||
:menuselection:`Manufacturing --> Master Data --> Bill of Materials` and hit *Create*. In this
|
||||
*BoM*, list the components which will be used by the subcontractor to manufacture the subcontracted
|
||||
finished product. Specify that the *BoM* type is *Subcontracting*.
|
||||
|
||||
.. image:: media/subcontract_03.png
|
||||
:align: center
|
||||
|
||||
@@ -8,8 +8,8 @@ production based on your demand forecast.
|
||||
Configuration
|
||||
=============
|
||||
|
||||
Go to the *Manufacturing app > Configuration > Settings* and activate
|
||||
the Master Production Schedule feature before hitting save.
|
||||
Go to the :menuselection:`Manufacturing app --> Configuration --> Settings` and activate the Master
|
||||
Production Schedule feature before hitting save.
|
||||
|
||||
.. image:: media/use_mps_01.png
|
||||
:align: center
|
||||
@@ -17,7 +17,7 @@ the Master Production Schedule feature before hitting save.
|
||||
.. tip::
|
||||
In the manufacturing settings, you can define the time range of your MPS (month/week/day) and the number of periods you want to display.
|
||||
|
||||
Now, go in *Planning > Master Production Schedule* and click on add a
|
||||
Now, go in :menuselection:`Planning --> Master Production Schedule` and click on add a
|
||||
product. You can now define your safety stock target (= the stock you
|
||||
want to have on hand at the end of the period) and the minimum and
|
||||
maximum quantities to replenish.
|
||||
|
||||
Reference in New Issue
Block a user